- A Study on Implementation Delay Factors of the Block-unit Housing Renewal Project - Focused on the Incheon Metropolitan City -
- 발행기관
- 한국BIM학회
- 저자명
- 한영훈 나인수
- 간행물 정보
- 『KIBIM Magazine』12권 4호, 32~40쪽, 전체 9쪽
- 주제분류
- 공학 > 건축공학
- 파일형태
- 발행일자
- 2022.12.31

국문 초록
영문 초록
The block-unit housing renewal project was presented as an alternative method to overcome the side effects of largescale renewal projects while improving poor residential conditions. However, projects implementation is prolonged and even the pace of projects, which was considered an various incentives, is being delayed for the most part. In this study, delay factors are drawn by eight; conflict among association members, contract delay of joint implementation, participation paucity of constructor, inadequate project guidelines, alteration of project plan, lack of renewal project professionals, stricter loan restriction of HUG, lack of capacity of project operator. We categorized those eight factors to three aspects such as implementation, participants and proposition and suggested improvement alternatives according to three aspects.
목차
1. 서 론
2. 가로주택정비사업의 특성 및 현황
3. 가로주택정비사업의 사업시행 지연요인 분석
4. 가로주택정비사업 지연요인 유형화 및 개선방안
5. 결론